Maintenance and upgrades, 2017
General - Monthly wash-down, and bottom cleaning. Quarterly clean and wax.
22 March - 9 May. Alizee at Olsen Marine boatyard, Fort Myers Beach, for a variety of work, some small and some large. Work completed on Invoice #148 included:
Haul and relaunch
Pressure wash, scrape and sand bottom, paint with Petit Ulima Pro SR (red)
Remove and replace shaft and hull zincs
Replaced broken dog latches
Repaired cap on emergency bilge pump
Installed new propane regulator and gauge and seal propane locker where line goes to galley
Removed and rebedded three portlights
Removed and replaced ST 60 instruments
Removed and replaced spacer tabs (custom teak) on swim ladder
Repaired glass damage on foward edge of anchor locker
Service three winches
Installed new 8 gps Shaffer Bilge pump
Cleaned and resealed mast and installed rubber boot
Replaced reefing line
Thoroughly cleaned bilge and discover small crack in shaft log
Removed prop, stuffing box and shaft, shaft log and tube
Repaired crack in shaft log
Cleaned and repacked stuffing box
Reinstalled shaft and stuffing box, and installed new cutless bearing
22 March - 9 May. Alizee at Olsen Marine boatyard, Fort Myers Beach, for a variety of work, some small and some large. Work completed on Invoice #148 included:
Haul and relaunch
Pressure wash, scrape and sand bottom, paint with Petit Ulima Pro SR (red)
Remove and replace shaft and hull zincs
Replaced broken dog latches
Repaired cap on emergency bilge pump
Installed new propane regulator and gauge and seal propane locker where line goes to galley
Removed and rebedded three portlights
Removed and replaced ST 60 instruments
Removed and replaced spacer tabs (custom teak) on swim ladder
Repaired glass damage on foward edge of anchor locker
Service three winches
Installed new 8 gps Shaffer Bilge pump
Cleaned and resealed mast and installed rubber boot
Replaced reefing line
Thoroughly cleaned bilge and discover small crack in shaft log
Removed prop, stuffing box and shaft, shaft log and tube
Repaired crack in shaft log
Cleaned and repacked stuffing box
Reinstalled shaft and stuffing box, and installed new cutless bearing
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home